Energy and Chemical Production Supporting Power Supply Project of a Certain Silicon Alloy Limited Liability Company in Sichuan Province


Project Overview

The power supply project supporting energy‑chemical production at a silicon alloy limited liability company in Sichuan is being supplied with customized power transformers by Shaanxi Hante Smart Power Equipment Co., Ltd. The core equipment consists of one S22‑63000/115‑10.5kV oil‑immersed, double‑winding, no‑load tap‑changing three‑phase power transformer, designed to meet the high‑energy‑consumption load requirements of silicon alloy and other chemical manufacturing processes. Delivery is scheduled within 40 days of the contract’s effective date, ensuring continuous and stable power supply to the energy‑chemical production lines.

 

Advantages and Features

1. High energy efficiency and low losses, meeting the demanding high-load requirements of the chemical industry.

• Equipped with an S22‑class energy‑efficiency model, its no‑load and load losses significantly exceed national standards, resulting in substantial long‑term reductions in electricity costs.

• Rated capacity: 63 MVA; voltage ratio: 115 ±2×2.5%/10.5 kV, perfectly matched to the power grid of the chemical industrial park.

2. High insulation and superior protection, suitable for harsh chemical‑industrial environments.

• Anti‑contamination casing, with a creepage distance of ≥31 mm/kV, offering excellent resistance to pollution and moisture, ideal for chemical plant environments characterized by high dust levels and corrosive conditions.

• Insulation class A, with high insulation withstand voltage standards and ample safety redundancy.

3. Stable and reliable operation, meeting the requirements of continuous production.

• Cooling method: ONAN; temperature rise is tightly controlled: top-oil temperature ≤ 55 K, average winding temperature rise ≤ 65 K, ensuring no overheating under long-term full-load operation.

• The fuel tank has passed a vacuum test at 133 Pa and a positive-pressure test at 98 kPa; it exhibits no leakage under a 50 kPa hydrostatic pressure for 24 hours, with a service life of ≥20 years.

4. Strong short-circuit and overload resistance

• The windings meet the dynamic and thermal stability requirements, with a short-circuit duration of ≥3 seconds, ensuring resilience against the inrush currents during the startup of chemical equipment.

• The overexcitation and overload capabilities comply with national standards, making it well-suited to the large load fluctuations and strong impact characteristics typical of chemical processes.

5. High-quality configuration, stable and reliable

• Both the primary and secondary windings are made of all-copper, offering excellent electrical conductivity, low heat generation, and long service life.

• Uses Karamay 45# naphthenic transformer oil and a vacuum oil-filling process, ensuring stable insulation and heat dissipation.

6. Delivery and Warranty Enhancement

• Prompt delivery within 40 days of the contract’s effective date, with the supplier responsible for transportation and associated costs, and timely performance.

• One-year warranty: free repairs, replacement of parts, and coverage of round-trip shipping costs—ensuring reliable after-sales service.

7. Low-noise and environmentally friendly, meeting park requirements.

• Noise level ≤ 70 dB (at a distance of 2 meters); partial discharge and radio‑frequency interference both meet the required standards, complying with environmental protection regulations for chemical industrial parks.

 

More cases

State Power Investment Corporation’s Lop Nur 100 MW/400 MWh energy storage project is paired with a 400 MW photovoltaic power generation project.

The State Power Investment Corporation’s 100 MW/400 MWh energy storage project is paired with a 400 MW photovoltaic power generation facility, located in the Hotan Prefecture of Xinjiang. The equipment was supplied by Shaanxi Hante Smart Electric Equipment Co., Ltd., and comprises four SFZ20‑100000/110 kV oil‑immersed three‑phase, double‑winding, on‑load tap‑changing step‑up transformers, along with associated grounding transformers, station service transformers, neutral‑point complete sets, and auxiliary equipment. Centered on 110 kV step‑up transmission, the project is tailored to accommodate the intermittent nature of solar generation; its integrated energy storage system enables coordinated operation between solar and storage, ensuring stable grid connection and reliable power supply. It serves as a critical substation‑level infrastructure supporting the large‑scale clean energy base in Hotan, Xinjiang.

Procurement Project for Supporting Power Supply Equipment for Infrastructure Construction in the Yilong New Area, Xingyi, Guizhou Province, by a Certain Construction Group Co., Ltd.

The infrastructure project‑related power supply equipment procurement for the Yilong New Area in Xingyi, undertaken by a construction group company in Guizhou Province, is being supplied by Shaanxi Hante Zhidian Equipment Co., Ltd. The core equipment is one SZ11‑50000 kVA/110 kV on‑load tap‑changing power transformer, which will be delivered to the project site in the Yilong New Area of Xingyi City, Guizhou Province, to meet the electricity demands of large‑scale infrastructure construction and ensure stable power supply upon subsequent commissioning.

Power Supply Renovation Project for the Mining Area of a Certain Mining Co., Ltd. in Qinghai Province

The power supply renovation project for the mining area of a certain mining limited liability company in Qinghai is located at the Sikuaoyangshengkutou mining site in Wutumeiren Township, Golmud City, Qinghai Province. The core substation equipment is supplied by Shaanxi Hante Zhidian Equipment Co., Ltd. The project’s key equipment includes: • One SZ18‑16000 kVA/110 kV oil‑immersed on‑load tap‑changing main transformer • Two SCB13‑200 kVA/10.5 kV dry‑type transformers, designed to operate in the extreme high‑altitude environment of 4,000 meters and to ensure reliable power supply for mining operations, including production, lighting, ventilation, and drainage—critical equipment for maintaining continuous production at this plateau‑level mine.

Energy and Chemical Production Supporting Power Supply Project of a Certain Silicon Alloy Limited Liability Company in Sichuan Province

The power supply project supporting energy‑chemical production at a silicon alloy limited liability company in Sichuan is being supplied with customized power transformers by Shaanxi Hante Smart Power Equipment Co., Ltd. The core equipment consists of one S22‑63000/115‑10.5 kV oil‑immersed, double‑winding, no‑load tap‑changing three‑phase power transformer, designed to meet the high‑energy‑consumption load requirements of silicon alloy and other chemical manufacturing processes. Delivery is scheduled within 40 days of the contract’s effective date, ensuring continuous and stable power supply to the energy‑chemical production lines.

Construction Project for the Intelligent Power Distribution Room of a 5G‑Enabled Unattended Digital Data Center at a Telecommunications Company in Hanzhong City

The construction project for the 5G‑enabled, unmanned digital substation’s intelligent distribution room at a telecommunications company in Hanzhong City is a turnkey upgrade and renovation of the power transformation and distribution system, undertaken by Shaanxi Hante Hezhuang Co., Ltd. Centered on the goals of intelligent distribution, unmanned operation, and stable, reliable performance, the project encompassed the high‑voltage system, distribution switchgear, cable laying, equipment installation and commissioning, software–hardware integration, and comprehensive system joint testing. The complete set of equipment and the entire system have passed acceptance by the power supply authority, resulting in a modern, intelligent distribution room that supports remote monitoring, automated operation, and minimal or zero on‑site staffing, thereby enhancing power supply stability, advancing the level of intelligence, and improving operational efficiency across the plant site.

A New Energy Power Station Construction Project for Heavy Trucks in Hanzhong City

The new‑energy power‑station construction project for a heavy‑truck manufacturer in Hanzhong City is centered on green, low‑carbon operations and intelligent O&M. It encompasses the complete installation of a full suite of systems, including new‑energy generation units, step‑up transformer and distribution systems, grid‑connection equipment, and an intelligent monitoring and energy‑management system. By employing standardized equipment configurations and an advanced, AI‑driven control scheme, the project has successfully completed all phases—equipment installation, system commissioning, and grid‑connection acceptance—and delivered a modern, reliable, and stable new‑energy power station capable of unmanned operation. This achievement ensures the efficient utilization of clean energy and its dependable integration into the grid.