Power Supply Renovation Project for the Mining Area of a Certain Mining Co., Ltd. in Qinghai Province
The power supply renovation project for the mining area of a certain mining limited liability company in Qinghai is located at the Sikuaoyangshengkutou mining site in Wutumeiren Township, Golmud City, Qinghai Province. The core substation equipment is supplied by Shaanxi Hante Zhidian Equipment Co., Ltd. The project’s key equipment includes: • One SZ18‑16000 kVA/110 kV oil‑immersed on‑load tap‑changing main transformer • Two SCB13‑200 kVA/10.5 kV dry‑type transformers, designed to operate in the extreme high‑altitude environment of 4,000 meters and to ensure reliable power supply for mining operations, including production, lighting, ventilation, and drainage—critical equipment for maintaining continuous production at this plateau‑level mine.
Project Overview
The power supply renovation project for the mining area of a certain mining limited liability company in Qinghai Province is located at the Sikao Yangsheng Kutou Mining Area in Wutumeiren Township, Golmud City, Qinghai Province. The core substation equipment is supplied by Shaanxi Hante Smart Electric Equipment Co., Ltd. The project’s key equipment includes:
• 1 SZ18-16000 kVA/110 kV oil-immersed on-load tap-changing main transformer
• Two SCB13‑200 kVA/10.5 kV dry‑type transformers are specially designed to operate in the extreme high‑altitude conditions of the mining area, at 4,000 meters above sea level, ensuring reliable power supply for production, lighting, ventilation, drainage, and other critical operations—making them essential equipment for maintaining continuous operations in high‑altitude mining environments.
Advantages and Features
1. Specially customized for high altitudes, designed to perform in extreme environments.
• Both main transformers and dry-type transformers are specially designed for altitudes up to 4,000 meters, with comprehensively enhanced insulation, heat dissipation, and dielectric strength, ensuring reliable operation under the harsh conditions of high-altitude low-pressure environments, intense solar radiation, and significant temperature fluctuations.
• The main transformer meets Level 3 energy efficiency standards, and the dry-type transformer features all-copper windings, ensuring energy savings and stable performance.
2. Advanced model with strong voltage regulation and protection capabilities.
• The main transformer is an SZ18‑16000/110kV on‑load tap changer, with a voltage regulation range of **±8×1.25%/10.5kV**, enabling online tap adjustment and accommodating load fluctuations in the mining area.
• Connection group Yd11, with impedance matching for the mine’s power supply system and strong short-circuit withstand capability.
3. Dry-type transformers are stable and reliable, requiring no maintenance.
• SCB13—10.5±2×2.5%/0.4 kV dry-type transformer, Dyn11 connection, 4% impedance, fire‑proof, explosion‑proof, and moisture‑resistant; suitable for underground mine environments and densely populated indoor spaces.
• Equipped with a fan and intelligent temperature control, featuring a stainless steel housing that is corrosion-resistant and vibration-proof, making it ideal for the harsh conditions of mining areas.
4. Intelligent operation and remote data transmission, meeting the needs of mine management.
• The main transformer is equipped as standard with remote data transmission capabilities, supporting remote monitoring of parameters such as voltage, current, temperature, and oil pressure, thereby enabling unattended operation and centralized control.
• Comprehensive protection systems and timely fault alerts help reduce the risk of power outages in mines.
5. Fast delivery and comprehensive service
• The goods shall be dispatched within 30 days of the contract’s effective date, transported by road directly to the mine site, with the supplier bearing the freight costs and ensuring timely delivery.
• Manufactured in accordance with national standards, with a one-year warranty and rapid after-sales support, ensuring continuous production at the mine.
More cases
The State Power Investment Corporation’s 100 MW/400 MWh energy storage project is paired with a 400 MW photovoltaic power generation facility, located in the Hotan Prefecture of Xinjiang. The equipment was supplied by Shaanxi Hante Smart Electric Equipment Co., Ltd., and comprises four SFZ20‑100000/110 kV oil‑immersed three‑phase, double‑winding, on‑load tap‑changing step‑up transformers, along with associated grounding transformers, station service transformers, neutral‑point complete sets, and auxiliary equipment. Centered on 110 kV step‑up transmission, the project is tailored to accommodate the intermittent nature of solar generation; its integrated energy storage system enables coordinated operation between solar and storage, ensuring stable grid connection and reliable power supply. It serves as a critical substation‑level infrastructure supporting the large‑scale clean energy base in Hotan, Xinjiang.
The infrastructure project‑related power supply equipment procurement for the Yilong New Area in Xingyi, undertaken by a construction group company in Guizhou Province, is being supplied by Shaanxi Hante Zhidian Equipment Co., Ltd. The core equipment is one SZ11‑50000 kVA/110 kV on‑load tap‑changing power transformer, which will be delivered to the project site in the Yilong New Area of Xingyi City, Guizhou Province, to meet the electricity demands of large‑scale infrastructure construction and ensure stable power supply upon subsequent commissioning.
The power supply renovation project for the mining area of a certain mining limited liability company in Qinghai is located at the Sikuaoyangshengkutou mining site in Wutumeiren Township, Golmud City, Qinghai Province. The core substation equipment is supplied by Shaanxi Hante Zhidian Equipment Co., Ltd. The project’s key equipment includes: • One SZ18‑16000 kVA/110 kV oil‑immersed on‑load tap‑changing main transformer • Two SCB13‑200 kVA/10.5 kV dry‑type transformers, designed to operate in the extreme high‑altitude environment of 4,000 meters and to ensure reliable power supply for mining operations, including production, lighting, ventilation, and drainage—critical equipment for maintaining continuous production at this plateau‑level mine.
The power supply project supporting energy‑chemical production at a silicon alloy limited liability company in Sichuan is being supplied with customized power transformers by Shaanxi Hante Smart Power Equipment Co., Ltd. The core equipment consists of one S22‑63000/115‑10.5 kV oil‑immersed, double‑winding, no‑load tap‑changing three‑phase power transformer, designed to meet the high‑energy‑consumption load requirements of silicon alloy and other chemical manufacturing processes. Delivery is scheduled within 40 days of the contract’s effective date, ensuring continuous and stable power supply to the energy‑chemical production lines.
The construction project for the 5G‑enabled, unmanned digital substation’s intelligent distribution room at a telecommunications company in Hanzhong City is a turnkey upgrade and renovation of the power transformation and distribution system, undertaken by Shaanxi Hante Hezhuang Co., Ltd. Centered on the goals of intelligent distribution, unmanned operation, and stable, reliable performance, the project encompassed the high‑voltage system, distribution switchgear, cable laying, equipment installation and commissioning, software–hardware integration, and comprehensive system joint testing. The complete set of equipment and the entire system have passed acceptance by the power supply authority, resulting in a modern, intelligent distribution room that supports remote monitoring, automated operation, and minimal or zero on‑site staffing, thereby enhancing power supply stability, advancing the level of intelligence, and improving operational efficiency across the plant site.
A New Energy Power Station Construction Project for Heavy Trucks in Hanzhong City
The new‑energy power‑station construction project for a heavy‑truck manufacturer in Hanzhong City is centered on green, low‑carbon operations and intelligent O&M. It encompasses the complete installation of a full suite of systems, including new‑energy generation units, step‑up transformer and distribution systems, grid‑connection equipment, and an intelligent monitoring and energy‑management system. By employing standardized equipment configurations and an advanced, AI‑driven control scheme, the project has successfully completed all phases—equipment installation, system commissioning, and grid‑connection acceptance—and delivered a modern, reliable, and stable new‑energy power station capable of unmanned operation. This achievement ensures the efficient utilization of clean energy and its dependable integration into the grid.