Procurement Project for Supporting Power Supply Equipment for Infrastructure Construction in the Yilong New Area, Xingyi, Guizhou Province, by a Certain Construction Group Co., Ltd.


Project Overview

The infrastructure project supporting power supply equipment procurement in the Yilong New Area of Xingyi, undertaken by a construction group company in Guizhou Province, is being supplied by Shaanxi Hante Intelligent Electric Equipment Co., Ltd. The core equipment consists of one SZ11‑50000 kVA/110 kV on‑load tap‑changing power transformer, which will be delivered to the project site in the Yilong New Area of Xingyi City, Guizhou Province, to meet the electricity demands of large‑scale infrastructure construction and ensure stable power supply upon subsequent commissioning.

 

Advantages and Features

1. The model is mature and reliable, well-suited to handle heavy infrastructure loads.

• An SZ11‑50000/110kV on‑load tap‑changing transformer is employed, providing ample capacity to ensure the stable operation of high‑power equipment during infrastructure construction.

• Wide voltage regulation range, with ±8 × 1.25% adjustment, to handle fluctuations in construction loads and unstable grid conditions.

2. On-load voltage regulation design ensures high power supply quality.

• On‑line on‑load voltage regulation enables uninterrupted voltage adjustment, ensuring continuous power supply during construction and preventing outages from disrupting the project schedule.

• Insulated and impedance-matched substation grid, with strong resistance to surges and short circuits.

3. Delivery and Service Assurance Are Fully in Place

• Delivery is scheduled for May 10, 2020, by road transport, with the supplier bearing the freight costs, ensuring stable performance.

• Manufactured in accordance with the technical specifications; one-year warranty and reliable after-sales service.

4. Designed for engineering applications, durable and easy to install.

• Compact design and high ingress protection, suitable for outdoor or temporary construction-site environments, with dust resistance and vibration tolerance.

• Standardized interfaces enable rapid on-site installation, commissioning, and startup, thereby shortening the waiting period for power connection during infrastructure construction.

 

More cases

State Power Investment Corporation’s Lop Nur 100 MW/400 MWh energy storage project is paired with a 400 MW photovoltaic power generation project.

The State Power Investment Corporation’s 100 MW/400 MWh energy storage project is paired with a 400 MW photovoltaic power generation facility, located in the Hotan Prefecture of Xinjiang. The equipment was supplied by Shaanxi Hante Smart Electric Equipment Co., Ltd., and comprises four SFZ20‑100000/110 kV oil‑immersed three‑phase, double‑winding, on‑load tap‑changing step‑up transformers, along with associated grounding transformers, station service transformers, neutral‑point complete sets, and auxiliary equipment. Centered on 110 kV step‑up transmission, the project is tailored to accommodate the intermittent nature of solar generation; its integrated energy storage system enables coordinated operation between solar and storage, ensuring stable grid connection and reliable power supply. It serves as a critical substation‑level infrastructure supporting the large‑scale clean energy base in Hotan, Xinjiang.

Procurement Project for Supporting Power Supply Equipment for Infrastructure Construction in the Yilong New Area, Xingyi, Guizhou Province, by a Certain Construction Group Co., Ltd.

The infrastructure project‑related power supply equipment procurement for the Yilong New Area in Xingyi, undertaken by a construction group company in Guizhou Province, is being supplied by Shaanxi Hante Zhidian Equipment Co., Ltd. The core equipment is one SZ11‑50000 kVA/110 kV on‑load tap‑changing power transformer, which will be delivered to the project site in the Yilong New Area of Xingyi City, Guizhou Province, to meet the electricity demands of large‑scale infrastructure construction and ensure stable power supply upon subsequent commissioning.

Power Supply Renovation Project for the Mining Area of a Certain Mining Co., Ltd. in Qinghai Province

The power supply renovation project for the mining area of a certain mining limited liability company in Qinghai is located at the Sikuaoyangshengkutou mining site in Wutumeiren Township, Golmud City, Qinghai Province. The core substation equipment is supplied by Shaanxi Hante Zhidian Equipment Co., Ltd. The project’s key equipment includes: • One SZ18‑16000 kVA/110 kV oil‑immersed on‑load tap‑changing main transformer • Two SCB13‑200 kVA/10.5 kV dry‑type transformers, designed to operate in the extreme high‑altitude environment of 4,000 meters and to ensure reliable power supply for mining operations, including production, lighting, ventilation, and drainage—critical equipment for maintaining continuous production at this plateau‑level mine.

Energy and Chemical Production Supporting Power Supply Project of a Certain Silicon Alloy Limited Liability Company in Sichuan Province

The power supply project supporting energy‑chemical production at a silicon alloy limited liability company in Sichuan is being supplied with customized power transformers by Shaanxi Hante Smart Power Equipment Co., Ltd. The core equipment consists of one S22‑63000/115‑10.5 kV oil‑immersed, double‑winding, no‑load tap‑changing three‑phase power transformer, designed to meet the high‑energy‑consumption load requirements of silicon alloy and other chemical manufacturing processes. Delivery is scheduled within 40 days of the contract’s effective date, ensuring continuous and stable power supply to the energy‑chemical production lines.

Construction Project for the Intelligent Power Distribution Room of a 5G‑Enabled Unattended Digital Data Center at a Telecommunications Company in Hanzhong City

The construction project for the 5G‑enabled, unmanned digital substation’s intelligent distribution room at a telecommunications company in Hanzhong City is a turnkey upgrade and renovation of the power transformation and distribution system, undertaken by Shaanxi Hante Hezhuang Co., Ltd. Centered on the goals of intelligent distribution, unmanned operation, and stable, reliable performance, the project encompassed the high‑voltage system, distribution switchgear, cable laying, equipment installation and commissioning, software–hardware integration, and comprehensive system joint testing. The complete set of equipment and the entire system have passed acceptance by the power supply authority, resulting in a modern, intelligent distribution room that supports remote monitoring, automated operation, and minimal or zero on‑site staffing, thereby enhancing power supply stability, advancing the level of intelligence, and improving operational efficiency across the plant site.

A New Energy Power Station Construction Project for Heavy Trucks in Hanzhong City

The new‑energy power‑station construction project for a heavy‑truck manufacturer in Hanzhong City is centered on green, low‑carbon operations and intelligent O&M. It encompasses the complete installation of a full suite of systems, including new‑energy generation units, step‑up transformer and distribution systems, grid‑connection equipment, and an intelligent monitoring and energy‑management system. By employing standardized equipment configurations and an advanced, AI‑driven control scheme, the project has successfully completed all phases—equipment installation, system commissioning, and grid‑connection acceptance—and delivered a modern, reliable, and stable new‑energy power station capable of unmanned operation. This achievement ensures the efficient utilization of clean energy and its dependable integration into the grid.